Availability: | |
---|---|
Quantity: | |
Basic Info.
Project Name: | Westlake University Laboratory steel structure |
Area: | |
Main Structure: | H steel beam |
OEM: | Support |
Welding Method: | Aubmerger Arc Welding |
Connection Method: | Bolt connection |
Transport Package: | bundles |
Delivery time: | 30days |
Project introduction:
Westlake University needs to build a laboratory steel platform to place some experimental equipment for experiments.
A small classroom built a steel frame, in conjunction with the circuit access, the utilization of the whole space increased.
Basic Info.
Project Name: | Westlake University Laboratory steel structure |
Area: | |
Main Structure: | H steel beam |
OEM: | Support |
Welding Method: | Aubmerger Arc Welding |
Connection Method: | Bolt connection |
Transport Package: | bundles |
Delivery time: | 30days |
Project introduction:
Westlake University needs to build a laboratory steel platform to place some experimental equipment for experiments.
A small classroom built a steel frame, in conjunction with the circuit access, the utilization of the whole space increased.